'''1 April 1941 – Reykjavik'''
+
'''1 April 1941 – [[Reykjavik]]'''
  
 
Civilian labour rates:-
 
Civilian labour rates:-
Line 5: Line 5:
 
Actual rates – Kronur per hour.  
 
Actual rates – Kronur per hour.  
 
   
 
   
                      Day (07:00 – 18:00) Overtime (18:00 – 22:00)          Night (22:00 – 07:00)    Sunday
+
              Day (07:00 – 18:00) Overtime (18:00 – 22:00)          Night (22:00 – 07:00)    Sunday
  
Kaldadarnes                     2.18 3.23 4.05 4.05
+
[[Kaldadarnes]]            2.18       3.23     4.05 4.05
  
  
Reykjavik                       2.422 3.691 4.288 4.5
+
[[Reykjavik]]              2.422       3.691     4.288 4.5
  
  
Keflavik                       2.167 3.00 3.653 3.833
+
Keflavik               2.167       3.00       3.653 3.833
  
  
In order to preserve surface and prevent gravel dust damaging wing fabric, the stone runway will be surfaced with bitumen when it arrives.  10 Sprayers delivered to KALDADARNES in readiness.
+
In order to preserve surface and prevent gravel dust damaging wing fabric, the stone runway will be surfaced with bitumen when it arrives.  10 Sprayers delivered to [[Kaldadarnes]] in readiness.
  
 
'''3 April 1941'''
 
'''3 April 1941'''
Line 36: Line 36:
 
6 April 1941
 
6 April 1941
  
Snowplough at [https://en.wikipedia.org/wiki/L%C3%B6gberg LOGBERG] and the SKI CLUB on the KALDADARNES Road withdrawn and returned to Royal Engineer stores.  One snowplough tractor (less plough) sent to KEFLAVIK for towing farm rollers and general work on Landing Ground.  Plan of Keflavik attached – see Appendix D below.
+
Snowplough at [https://en.wikipedia.org/wiki/L%C3%B6gberg LOGBERG] and the SKI CLUB on the [[Kaldadarnes]] Road withdrawn and returned to Royal Engineer stores.  One snowplough tractor (less plough) sent to KEFLAVIK for towing farm rollers and general work on Landing Ground.  Plan of Keflavik attached – see Appendix D below.
  
 
'''10 April 1941'''
 
'''10 April 1941'''
Line 42: Line 42:
 
Showers all day.
 
Showers all day.
  
Owing to the Easter holiday civilians are working on priority jobs only e.g. Kaldadarnes, Reykjavik, Keflavik aerodrome at Sunday rates.
+
Owing to the Easter holiday civilians are working on priority jobs only e.g. [[Kaldadarnes]], [[Reykjavik]], Keflavik aerodrome at Sunday rates.
  
 
19 Field Survey Company, Royal Engineers less detachment 1 NCO and three men embark from UK.   
 
19 Field Survey Company, Royal Engineers less detachment 1 NCO and three men embark from UK.   
Line 74: Line 74:
 
Message 695/AQ “Stand by for thaw cancelled”.
 
Message 695/AQ “Stand by for thaw cancelled”.
  
Governor gear from [https://en.wikipedia.org/wiki/Aveling-Barford Aveling Barford Roller] at KALDADARNES received for repair having been damaged in a collision with an aircraft.
+
Governor gear from [https://en.wikipedia.org/wiki/Aveling-Barford Aveling Barford Roller] at [[Kaldadarnes]] received for repair having been damaged in a collision with an aircraft.
  
 
Progress Reports:-
 
Progress Reports:-
Line 84: Line 84:
 
'''13 April 1941'''
 
'''13 April 1941'''
  
Commander, Royal Engineers visits KALDADARNES.  The stone “A” runway appears to be successful for [https://en.wikipedia.org/wiki/Lockheed_Hudson Hudson] aircraft but owing to the very soft nature of the ground the matting is useless.  It is proposed to put a concrete runway instead.
+
Commander, Royal Engineers visits [[Kaldadarnes]].  The stone “A” runway appears to be successful for [https://en.wikipedia.org/wiki/Lockheed_Hudson Hudson] aircraft but owing to the very soft nature of the ground the matting is useless.  It is proposed to put a concrete runway instead.
  
 
Progress Report 294 Army Field Company, Royal Engineers, see Appendix G below.
 
Progress Report 294 Army Field Company, Royal Engineers, see Appendix G below.
Line 92: Line 92:
 
Snow all day.
 
Snow all day.
  
18:00 hours.  Snowploughs sent out to LOGBERG and the SKI-CLUB on the KALDADARNES road.
+
18:00 hours.  Snowploughs sent out to LOGBERG and the SKI-CLUB on the [[Kaldadarnes]] road.
  
 
Civilian labour working at priority jobs only at double rates.
 
Civilian labour working at priority jobs only at double rates.
Line 110: Line 110:
 
'''20 April 1941'''
 
'''20 April 1941'''
  
First convoy of 50 tons cement sent to KALDADARNES – this will continue daily.
+
First convoy of 50 tons cement sent to [[Kaldadarnes]] – this will continue daily.
  
 
Progress Report 294 Army Field Company, Royal Engineers – see Appendix J attached.
 
Progress Report 294 Army Field Company, Royal Engineers – see Appendix J attached.
Line 118: Line 118:
 
Extract from “G” Conference.
 
Extract from “G” Conference.
  
(a) The extra Officer who is required at KALDADARNES for work in connection with civilian labour and accounts cannot be spared from an Infantry Battalion.
+
(a) The extra Officer who is required at [[Kaldadarnes]] for work in connection with civilian labour and accounts cannot be spared from an Infantry Battalion.
  
(b) Owing to the expected arrival of ships at HAFNAFJORDUR and extra transport on the road from REYKJAVIK its condition should be improved.
+
(b) Owing to the expected arrival of ships at [[Hafnafjordur]] and extra transport on the road from [[Reykjavik]] its condition should be improved.
  
  
Line 146: Line 146:
 
'''30 April 1941'''
 
'''30 April 1941'''
  
Detachment 294 Army Field Company, Royal Engineers at KALDADARNES under Lieut Green Royal Engineers relieved by detachment 807 Road Construction Company, Royal Engineers under 2/Lt Gieves, Royal Engineers.
+
Detachment 294 Army Field Company, Royal Engineers at [[Kaldadarnes]] under Lieut Green Royal Engineers relieved by detachment 807 Road Construction Company, Royal Engineers under 2/Lt Gieves, Royal Engineers.
  
 
'''Appendices attached to the April 1941 War Diary of Iceland (C ) Force Commander, Royal Engineers.'''
 
'''Appendices attached to the April 1941 War Diary of Iceland (C ) Force Commander, Royal Engineers.'''

Latest revision as of 14:45, 4 May 2018

1 April 1941 – Reykjavik

Civilian labour rates:-

Actual rates – Kronur per hour.

             Day (07:00 – 18:00) Overtime (18:00 – 22:00)          Night (22:00 – 07:00)     Sunday

Kaldadarnes 2.18 3.23 4.05 4.05


Reykjavik 2.422 3.691 4.288 4.5


Keflavik 2.167 3.00 3.653 3.833


In order to preserve surface and prevent gravel dust damaging wing fabric, the stone runway will be surfaced with bitumen when it arrives. 10 Sprayers delivered to Kaldadarnes in readiness.

3 April 1941

Important stores arrived from UK in S S EGYPTIAN PRINCE – 12 tons Ammonal, 6 ½ tons guncotton, 2 excavators (2 tons), 4 D by 6 Rollers. On S S GIRONDE 1055 tons [Ferrocrete.

5 April 1941

Progress reports:-

(a) Work under contract. See Appendix A below.

(b) Work under 294 Field Company Royal Engineers. See Appendix B below.

(c) Work under 803 Road Construction Company Royal Engineers. See Appendix C below.

Snowplough withdrawn from 294 Field Company and returned to Royal Engineer stores.

6 April 1941

Snowplough at LOGBERG and the SKI CLUB on the Kaldadarnes Road withdrawn and returned to Royal Engineer stores. One snowplough tractor (less plough) sent to KEFLAVIK for towing farm rollers and general work on Landing Ground. Plan of Keflavik attached – see Appendix D below.

10 April 1941

Showers all day.

Owing to the Easter holiday civilians are working on priority jobs only e.g. Kaldadarnes, Reykjavik, Keflavik aerodrome at Sunday rates.

19 Field Survey Company, Royal Engineers less detachment 1 NCO and three men embark from UK.

3 Fordson 15cwt trucks taken over by this HQ, the 15cwt on loan from 294 Field Company being returned.

11 April 1941

No civilian work today Good Friday. This HQ moves from the ICE FACTORY to the GOVERNMENT POTATO STORE (75 yards away) previously occupied by 19 Field Survey Company, Royal Engineers.

The Survey detachment plus 1 Private (map storeman) from the Pioneer Corps attached to this HQ to carry on essential printing. All future stocks of maps will be obtained from the War Office who now hold plates prepared by 19 Survey Company, Royal Engineers. The following machinery has been left for use:-

Furnival Duplicator (Proofing Press)

Hot Plate.

Battery 4 pt Anc (?)

Whirlers, Grainers and Printing Frame.

This enables the Vandyke, Helio and Ozalid processes to be carried out.

Message 691/AQ from Force HQ “Stand by for thaw”.

12 April 1941

Normal civilian working day.

Ice Factory handed over to the Royal Navy.

Message 695/AQ “Stand by for thaw cancelled”.

Governor gear from Aveling Barford Roller at Kaldadarnes received for repair having been damaged in a collision with an aircraft.

Progress Reports:-

(a) Work under contract. See Appendix E below.

(b) Work under 803 Road Construction Company Royal Engineers. See Appendix F below.

13 April 1941

Commander, Royal Engineers visits Kaldadarnes. The stone “A” runway appears to be successful for Hudson aircraft but owing to the very soft nature of the ground the matting is useless. It is proposed to put a concrete runway instead.

Progress Report 294 Army Field Company, Royal Engineers, see Appendix G below.

14 April 1941

Snow all day.

18:00 hours. Snowploughs sent out to LOGBERG and the SKI-CLUB on the Kaldadarnes road.

Civilian labour working at priority jobs only at double rates.

17 April 1941

Sunny day and warm.

19 April 1941

Chief Engineer decides to construct “B” Runway (see attached plan – Appendix H) with colloidal concrete. The filling to be of a cement sand mix surfaced with about 1 ½ concrete. This, it is hoped will produce quickly a runway 900 yards by 50 yards capable of taking Hudson aircraft.

Progress of runway ay KEFLAVIK (Gardarskagi) – 40%.

Report 803 Road Construction Company, Royal Engineers – see Appendix I attached.

20 April 1941

First convoy of 50 tons cement sent to Kaldadarnes – this will continue daily.

Progress Report 294 Army Field Company, Royal Engineers – see Appendix J attached.

21 April 1941

Extract from “G” Conference.

(a) The extra Officer who is required at Kaldadarnes for work in connection with civilian labour and accounts cannot be spared from an Infantry Battalion.

(b) Owing to the expected arrival of ships at Hafnafjordur and extra transport on the road from Reykjavik its condition should be improved.


(c ) It is estimated that the jetty at HVITANES will be completed by the 5th of May.


26 April 1941

Progress at KEFLAVIK - 45%.

Progress Report:-

803 Road Construction Company Royal Engineers, - see Appendix K attached.

27 April 1941

Progress Report:-

294 Army Field Company, Royal Engineers – see Appendix L attached.

2/Lt F L Randle, Royal Engineers arrives on H M T Royal Ulsterman and assumes the appointment of Field Engineer 3.

807 Road Construction Company, Royal Engineers arrive on HMT Royal Scotsman, commanded by Major Giles, Royal Engineers and accommodated with 688 Artisan Works Company, Royal Engineers.

30 April 1941

Detachment 294 Army Field Company, Royal Engineers at Kaldadarnes under Lieut Green Royal Engineers relieved by detachment 807 Road Construction Company, Royal Engineers under 2/Lt Gieves, Royal Engineers.

Appendices attached to the April 1941 War Diary of Iceland (C ) Force Commander, Royal Engineers.

None of the Appendices referred to in the above text seem to have been included within the War Diary file.


To contact the author by e-mail with any queries, or to send information - click here.